In order for me to get a straight hit on the punch, I needed to first release the bail on the implement lift lever, as I have spring assist and needed the push/dozer blade lift rod removed.
Small, light hits on the punch were many. I feared to crack the spiral pin and was extra careful. Tap- tap- tap and the spiral pin was seated flush, as when I removed it.
Next was to grease the newly seated axel.
__________________
IH CUB CADET 1450, 72, 86, 1211, IH #2 CART, IH 56" SNOW BLADE, COLLECTING CUB CADET ENGINES
|