That looks like it works, nice! I've done similar on my 682 with the blower on the front and my rinky dink back scraper set up as seen in the homemade section recently. I have a chain and hook for the blower on the front (see pic) lift the blower to highest position, hook the chain, lower blower till the weight is on the chain then disconnect the lift rod right at the base of the manual lift lever. The back is similar but different the lift lever stays connected to the rear in the tunnel all the time but lift to rear scraper connection is chains which allows me to lift it to the highest position then wrap a chain over that ball to suspend the rear lift while using the blower. The 2 draped chains go to the lift arms of my homemade 3 point. The chain link to the rear scraper was a last minute effort to save time but really worked out well in the end, I just need to work on the "point of connection" to the scraper bars to get better range of motion, I think it is too far aft now. Sure seems like a lot of chain!
Vic
|