Finally got to work on the 14 yesterday. I got all of the steel lines cut bent and installed from the pump to the column and spool valve. Got the lines for the steering cylinder made, and had new ones build for the lift cylinder while I was at it. All that is left for hydraulic lines now is to tie in the front and rear outlets to the scv.
After that, I need to finish the steering cylinder bracket, make the drag link, shem the front axle, hook up the hydraulic levers re-install the engine and test it out! Ofcourse I'm leaving smaller stuff out, but y'all get the picture.
I'll have pix tomorrow.
|