I'm in California where Cub Cadets are almost non-existent. I don't think I'll fill the shed anytime soon.
They delivered the lumber at 12 noon and I had what you see done by 4. Today will be a short day because it is Christmas Eve. I will drill holes in the slab and sill and bolt it down with Red Heads. If I can get the outside sheeted with T1-11 plywood I'll call it a day.
Next I need to stack the roof and finish it. I am planning on framing a gable roof. I have to join two roofs because of the section in the back. I have never done that before and I am looking forward to the challenge.
|