Not much progress today. I did get the pins out of the rockshaft. I decided to drill the holes out to 9/16 and turn the new pins down as needed. Going to make them protrude out about another .100" so I can get a washer between the lift links and the cotter pin.
__________________
2072 w/60" Haban
982 with 3 pt and 60" Haban
1811 with ags and 50C
124 w/hydraulic lift
782 w/mounted sprayer
2284 w/54" mowing deck
|