If you're concerned about it you could add a 2 x 4 wailer at the top of your 2 x 10. Either nailed on top flush with the inside edge, or on the outside, screwed on from the inside. Add some 2 x 4 diagonals on the flat at your corners that you can remove after the concrete is placed and consolidated.
And don't pour piss!
|