Thread: New shop
View Single Post
  #132  
Old 10-27-2018, 10:36 PM
Oak's Avatar
Oak Oak is offline
Senior Moderator
 
Join Date: Jun 2009
Location: Georgia
Posts: 5,392
Default

Update

Last week I worked my butt off cutting and swinging a 20lb sledgehammer. I pulled the 4" pipe that was embedded in the concrete and went back with a 3" since this is only for the floor drains and some sinks + I didn't want to cut anymore crete. Mr. Inspector wanted the pipe sleeved where it went through or under the footing....I should have known that. I ran the 3" through a 6" schedule 40 PVC pipe to outside of the form board. Here is the final result.....dang I needed a hot tub last Saturday night.
DSCN4197.jpg

I also moved the 4" sewer pipe for the apartment and second floor bathroom over 2' so that it is in the "dirt" now instead of in the concrete. This one also got sleeved in the footer/turndown portion of the mono. The inspector didn't like how I ran it even though I had it supported with rebar and wire. The first pic shows how it was run and the 2nd is how it will be.

I hope to finish the apartment side tomorrow and schedule an inspection for the first part of next week.

DSCN4165.jpg DSCN4201.jpg
__________________
This ain't no hobby....it's an addiction
Reply With Quote