View Single Post
  #6  
Old 11-16-2018, 10:16 AM
finsruskw finsruskw is offline
Grand Member
 
Join Date: Mar 2013
Location: Iowa
Posts: 3,308
Default

Here's another. Our ongoing project is to fill in the sunken walkways between the rows of grave stones. Makes it much much easier to mow.

Some take as much as 12"+ to get them leveled enough to mow with a large deck. I also put the tiller to good use as well knocking down some of the high spots and embankments at the ends of the rows.

Here, I am leveling soil that was dumped at the ends of the rows from a pick-up box trailer w/hydraulic lift. Dumping about 1/2 load each time, then spreading it makes for easier clean up. Trying to keep heavy equipment on the road paths and not on the graves themselves. We can dump on each end that way and work towards the middle. This will be a multi year project. We are in year 3 now, only getting 1/2 of a section done this year due to cost overruns with a hired contractor that provided the fill dirt. This pic is from 2 years ago.
Attached Images
File Type: jpg DSCN5039.jpg (34.7 KB, 317 views)
Reply With Quote