View Single Post
  #16  
Old 12-03-2020, 09:57 PM
Ambush Ambush is offline
Senior Member
 
Join Date: Nov 2020
Location: British Columbia
Posts: 802
Default

Well, due to a bannister contractor working from my garage, I had to cover the 149 today.. so no plow frame work. BUT: I did have the pics and sketches that ole'George e-mailed () me for the tiller mount bracket. I had some 1/4'X2" bar and a chunk of 1/4" plate picked out already. Just had to get the drive to set up the plasma cutter outside in the cold. Cut out the back and side pieces and two short bars. Did some layout work and stack drilling then jigged the pieces up. Followed up by the welding and clean up with the flap disc. ,
Attached Images
File Type: jpg IMG_2068.jpg (15.1 KB, 84 views)
File Type: jpg IMG_2069.jpg (15.5 KB, 82 views)
File Type: jpg IMG_2070.jpg (14.6 KB, 83 views)
Reply With Quote