View Single Post
  #7  
Old 10-05-2011, 05:11 AM
cdlong's Avatar
cdlong cdlong is offline
Senior Member
 
Join Date: May 2010
Location: Newark,Delaware
Posts: 419
Default

Belt routing from manual. This is how I have the belt. My measurement from the center of the pulley with the adjusting spring to the front of the mule drive is 4". Manual states it should be 3 & 1/2". That is why I'm ordering a 6882 Gates belt. 82" long.
Attached Images
File Type: jpg QA 38-42-48 Deck Operators Manual-3 (1024x861).jpg (29.3 KB, 115 views)
__________________
Papaw
1984 CCC 582 w/ creeper, 42" blade, 44C deck, 220# wheel weights, 2 link chains & adjusters, Spring assist lift.
Reply With Quote