Quote:
Originally Posted by darkminion_17 View Post
Looks great I need something like that.

And no I will not come to help.
Aww man...

I'll definitely be doing half the floor at a time. I have to buggy the crete about 200' as the truck wont be able to get to the building..

The lift I have (bought used) has spread footing, I was thinking of using sono tubes where the lift bolts to the floor. Mono pouring the tubes with the floor.
Think that'll work?